Installation – Pour In
This option reduces the overall costs in new installations. Concrete can be poured around the dock leveler during the floor pour of the building. All installation welding is completed at the factory.
Curb Angle Assembly
Steel angle iron with tab anchors welded along it are provided and embed into the edges of the dock leveler pit. The curb angle provides a metal edge to weld the dock leveler to during installation...
Shim Kits
Shim kits are utilized to facilitate the installation of the dock leveler into a pit that is deeper than the standard pit depth.
Free Standing Frame
If floor space is at a premium a free standing frame assembly can be used to install a dock leveler on the exterior of the building.