Declining driveway approaches are very common at the loading dock area. Incoming vehicles are backed into position at an angle determined by the percentage of the decline. The most effective method to address this situation is to project the dock leveler pit forward. The amount of projection is determined by the percentage of the driveway decline. Projecting the dock leveler pit at the onset eliminates damage caused by vehicle impact to the building and the resultant need for aftermarket bumper extensions, longer hinged lip assemblies etc. to address this condition. Please click here for more information.

Contact a Pentalift Sales Representative for more information.