Dock levelers are available to suit either a preformed pit installation or a “cast-in-place” pour in design. The pour in place design lowers the overall cost of the installation by eliminating any on-site forming, and minimizes labor required to commission the equipment. Scheduling the dock equipment becomes more important to ensure that the dock leveler is on site and in position at the time of the concrete pour. Preformed pit installations have more flexibility regarding the timing of delivery, and should the application change in the future they can be more easily removed and replaced. Contact your Pentalift Sales Representative for more information.